Morwell Campus
Between 2019 and 2023, the Morwell Campus underwent a significant, multi-stage redevelopment, transforming the site into a modern, dynamic learning environment.
The project commenced with the demolition of outdated facilities, including Blocks A, E and F, and the former Arts Block, to make way for contemporary, purpose-built spaces. The initial stage delivered key learning areas, including new Year 9–10 classrooms in the Orange Building, a state-of-the-art science facility in the Green Building, and a combined performing arts and food technology centre—featuring a 200-seat performance space—alongside a new canteen within the Purple Building.
Subsequent stages expanded the campus further. The Yellow Building introduced a dedicated Year 7–8 learning precinct, incorporating general learning areas, breakout spaces and seminar rooms, a new staffroom, and an art room. Additional works within the Purple Building included the construction of a modern library, an IT department, and an additional classroom.



The final phase of the redevelopment delivered a contemporary administration centre spanning over 500 square metres. This purpose-built facility includes staff workspaces, a welcoming reception area, meeting rooms, and flexible multipurpose spaces designed to support collaboration and the day-to-day operations of the College.
The redevelopment was complemented by targeted landscaping and infrastructure upgrades, including improved site drainage, covered walkways connecting buildings, and thoughtfully designed outdoor seating areas for students and staff.
Further investment in 2022 strengthened the campus’s digital capacity, with upgrades to IT infrastructure, including server replacements and enhanced student laptop provision.
Collectively, these upgrades demonstrate a strong commitment to providing innovative, future-focused facilities that support student engagement, wellbeing, and improved learning outcomes.



